Engineering
Define the system.
Prove the behaviour.
Practical notes for the decisions that shape a controls, monitoring, inspection or integration project.
What should a machine data contract contain?
Agree meaning, identity and failure behaviour before connecting systems.
Read the engineering noteDesign the response, not just the alert.
Connect every important condition to a responsible person and an action.
Read the engineering noteDefine inspection acceptance before the build.
Set the reference examples and decision rules before judging the result.
Read the engineering noteLet’s make the connection